4-Week Pilot Program

Validate FieldSpace, KPI-Driven

A structured, measurable pilot designed for autonomy teams. Week 0: scope. Week 1: log replay. Week 2: closed-course trials. Week 3: final KPI report and go/no-go decision.

The 4-Week Pilot Timeline

From kickoff to KPI report in one month. Structured, measurable, and designed for fast validation.

0

Week 0

Scope & Data Share

  • Define KPIs: false positives, latency, compute, degraded-comms resilience
  • Share logs: 30+ min of operation, ROS bags or video
  • Map topics: ROS 1/2 or gRPC sensor endpoints
  • Safety planning: closed-course access, safety operator

Deliverable: Pilot plan & KPI targets

1

Week 1

Log Replay & Baseline

  • Connect FieldSpace: integrate with your sensor topics
  • Run replay: process your logs offline, no vehicle risk
  • Baseline KPIs: measure false positives, latency, compute
  • Edge cases: identify scenarios where physics catches perception errors

Deliverable: Baseline KPI report

2

Week 2

Closed-Course Trials

  • On-vehicle setup: FieldSpace runs in parallel to your stack
  • Closed-course runs: test track with safety operator
  • A/B testing: compare with/without FieldSpace physics layer
  • Data collection: record KPIs from live operation

Deliverable: On-vehicle test data

3

Week 3

A/B & Final Report

  • A/B trials: final on-vehicle comparison runs
  • Degraded-comms test: validate resilience when perception/network fails
  • Compute audit: measure GPU/CPU savings from early pruning
  • Final KPI report: all metrics, go/no-go recommendation

Deliverable: Final KPI report & decision

What's Included in Your Pilot

Dedicated support and technical resources to ensure pilot success.

👥

Dedicated Team

  • • Technical integration engineer
  • • Solutions architect for your platform
  • • Direct Slack/email support
  • • Weekly sync calls
📦

Tools & Resources

  • • ROS 1/2 and gRPC integration guides
  • • Log replay sandbox
  • • KPI dashboard and analytics
  • • Sample configs for your sensor suite
📊

Reporting & Analysis

  • • Baseline KPI report (Week 1)
  • • On-vehicle test summary (Week 2)
  • • Final comprehensive report (Week 3)
  • • Degraded-comms scenario analysis

Ready to Start Your Pilot?

Book a technical review to discuss your platform, KPIs, and pilot timeline.

4-week pilot. KPI-driven. Built for autonomy engineering teams.