4-Week Pilot Program
Validate FieldSpace, KPI-Driven
A structured, measurable pilot designed for autonomy teams. Week 0: scope. Week 1: log replay. Week 2: closed-course trials. Week 3: final KPI report and go/no-go decision.
The 4-Week Pilot Timeline
From kickoff to KPI report in one month. Structured, measurable, and designed for fast validation.
0
Week 0
Scope & Data Share
- •Define KPIs: false positives, latency, compute, degraded-comms resilience
- •Share logs: 30+ min of operation, ROS bags or video
- •Map topics: ROS 1/2 or gRPC sensor endpoints
- •Safety planning: closed-course access, safety operator
Deliverable: Pilot plan & KPI targets
1
Week 1
Log Replay & Baseline
- •Connect FieldSpace: integrate with your sensor topics
- •Run replay: process your logs offline, no vehicle risk
- •Baseline KPIs: measure false positives, latency, compute
- •Edge cases: identify scenarios where physics catches perception errors
Deliverable: Baseline KPI report
2
Week 2
Closed-Course Trials
- •On-vehicle setup: FieldSpace runs in parallel to your stack
- •Closed-course runs: test track with safety operator
- •A/B testing: compare with/without FieldSpace physics layer
- •Data collection: record KPIs from live operation
Deliverable: On-vehicle test data
3
Week 3
A/B & Final Report
- •A/B trials: final on-vehicle comparison runs
- •Degraded-comms test: validate resilience when perception/network fails
- •Compute audit: measure GPU/CPU savings from early pruning
- •Final KPI report: all metrics, go/no-go recommendation
Deliverable: Final KPI report & decision
What's Included in Your Pilot
Dedicated support and technical resources to ensure pilot success.
👥
Dedicated Team
- • Technical integration engineer
- • Solutions architect for your platform
- • Direct Slack/email support
- • Weekly sync calls
📦
Tools & Resources
- • ROS 1/2 and gRPC integration guides
- • Log replay sandbox
- • KPI dashboard and analytics
- • Sample configs for your sensor suite
📊
Reporting & Analysis
- • Baseline KPI report (Week 1)
- • On-vehicle test summary (Week 2)
- • Final comprehensive report (Week 3)
- • Degraded-comms scenario analysis
Ready to Start Your Pilot?
Book a technical review to discuss your platform, KPIs, and pilot timeline.
4-week pilot. KPI-driven. Built for autonomy engineering teams.